Client: Iran Malas Co. – 2012

Address: Between 25th and 27th Saremi St.

Project Specifications: The Authoritative building was built in 4 floors and 3000 m2 of building area.

Solution: Providing stable comfort conditions for the staff at Iran Mallas’s headquarters was of importance in that it could fosters their performance. Having that in mind, our best suggestion – the ultimate solution for a balanced HVAC system – was to use pressure independent balancing and control valves (PIBCV). A total 35 pcs of FRESE OPTIMA Compact PICV was then retrofitted into the system.